Construction to begin on Highway 18 & 73 Intersection

Beginning the week of April 12, Martin’s main stop will look a little different.

Bituminous Paving, Inc., out of Odessa, Minn., will begin construction at the intersection of highways 18 and 73 in Martin. The lights are going to be replaced and concrete work done.

As a result, there will be a four way stop with one lane traffic going in all four directions.

Remember to please drive slow and safe during this time and be patient!

502 Second Avenue, Martin, SD 57551 • 605-685-6866 • booster@gwtc.net